• Actual language: english
  • switch to Greek

Country

United KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomPolandPolandBelgiumSwedenSwedenSwedenSwedenSwedenNetherlandsNetherlandsSloveniaPortugalPortugalPortugalPortugalPortugalGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceSpainSpainSpainSpainSpainSpainSpainSpainSpainSpainSpainSpainSpainBulgariaItalyItalyItalyItalyItalyCzech RepublicSlovakiaGermanyGermanyGermanyGermanyAustriaFranceFranceFranceFranceFranceFranceFrance

Legend

 
smart
 
fair
 
improvable
 
troublesome
 
bad
Severe barrier

Database Help

Segments

Processes

Steps

Barriers

Indicators

Compare Results

Last update: 13.05.2014

National Contact Point: HELLENIC ASSOCIATION OF PHOTOVOLTAIC COMPANIES (HELAPCO) - Stelios Psomas
(spsomas(at)otenet.gr, info(at)helapco.gr)

... (Unhide text)
 
For being eligible to incentives (feed-in-tariffs) when installing a small residential PV system (<10 kW), a part of the building's hot water needs must be covered by renewable energy sources such as solar thermal systems. The only authorities involved in authorization are the local branch of the Distribution Network Operator (HEDNO, which issues a grid-connection offer) and the Public Power Corporation (PPC) (or any other electricity retailer) with which a “compensation agreement” is being signed. As of winter 2011, installation of rooftop systems on listed buildings is not allowed.

 
Waiting Time
 
Active time
On average, 90% of total project duration is waiting time
 
Grid connection and relevant permitting accounts on average for 82% of all waiting time

 
Legal-administrative Labour Requirements
 
Non Legal-administrative Labour Requirements
Legal-administrative related labour requirements account for 20% of total labour for the project

 
Legal-administrative costs
 
Other costs
Legal-administrative requirements account on average for 53% of overall developement costs (excluding PV equipment)
 
Fee for grid connection is on average 46% of total costs (excluding PV equipment). Cost of meter is too high compared to other countries and can be reduced considerably