United KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomPolandPolandBelgiumSwedenSwedenSwedenSwedenSwedenNetherlandsNetherlandsSloveniaPortugalPortugalPortugalPortugalPortugalGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceSpainSpainSpainSpainSpainSpainSpainSpainSpainSpainSpainSpainSpainBulgariaItalyItalyItalyItalyItalyCzech RepublicSlovakiaGermanyGermanyGermanyGermanyAustriaFranceFranceFranceFranceFranceFranceFrance

Legend

 
smart
 
fair
 
improvable
 
troublesome
 
bad
Severe barrier

Database Help

get link Segments

follow Processes

click here Steps

Barriers

Indicators

follow url Compare Results

Last update: 13.05.2014

porno hentai unzensiert National Contact Point: HELLENIC ASSOCIATION OF PHOTOVOLTAIC COMPANIES (HELAPCO) - Stelios Psomas
(spsomas(at)otenet.gr, info(at)helapco.gr)

... (Unhide text)
 
For being eligible to incentives (feed-in-tariffs) when installing a small residential PV system (<10 kW), a part of the building's hot water needs must be covered by renewable energy sources such as solar thermal systems. The only authorities involved in authorization are the local branch of the Distribution Network Operator (HEDNO, which issues a grid-connection offer) and the Public Power Corporation (PPC) (or any other electricity retailer) with which a “compensation agreement” is being signed. As of winter 2011, installation of rooftop systems on listed buildings is not allowed.

 
Waiting Time
 
Active time
Applying for a connection point is basically waiting time. It takes the installer or system-operator just a couple of hours to fullfill the administrative requirenments. On average, 95% of this process duration is waiting time
 
Waiting time for grid connection permit accounts on average for 49% of all waiting time

 
Legal-administrative Labour Requirements
 
Non Legal-administrative Labour Requirements
The installer's staff prepares a file including all relevant documents required by the grid operator, and visits the grid operator's office for filing of the application.

 
Legal-administrative costs
 
Other costs
During this process, there are no non-legal-administrative costs incured.
 
Fee for grid connection is on average 46% of total costs (excluding PV equipment). Cost of meter is too high compared to other countries and can be reduced considerably