• Actual language: english
  • switch to Greek

Country

United KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomPolandPolandBelgiumSwedenSwedenSwedenSwedenSwedenNetherlandsNetherlandsSloveniaPortugalPortugalPortugalPortugalPortugalGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceSpainSpainSpainSpainSpainSpainSpainSpainSpainSpainSpainSpainSpainBulgariaItalyItalyItalyItalyItalyCzech RepublicSlovakiaGermanyGermanyGermanyGermanyAustriaFranceFranceFranceFranceFranceFranceFrance

Legend

 
smart
 
fair
 
improvable
 
troublesome
 
bad
Severe barrier

Database Help

go Segments

click Processes

Steps

here Barriers

click Indicators

Compare Results

Last update: 13.05.2014

National Contact Point: HELLENIC ASSOCIATION OF PHOTOVOLTAIC COMPANIES (HELAPCO) - Stelios Psomas
(spsomas(at)otenet.gr, info(at)helapco.gr)

... (Unhide text)
 
For being eligible to incentives (feed-in-tariffs) when installing a small residential PV system (<10 kW), a part of the building's hot water needs must be covered by renewable energy sources such as solar thermal systems. The only authorities involved in authorization are the local branch of the Distribution Network Operator (HEDNO, which issues a grid-connection offer) and the Public Power Corporation (PPC) (or any other electricity retailer) with which a “compensation agreement” is being signed. As of winter 2011, installation of rooftop systems on listed buildings is not allowed.

Filing of application for grid connection to the local branch of the Distribution Network Operator

Filing of application for grid connection to the local branch of the Distribution Network Operator (HEDNO).
The application form (available in HEDNO's website, http://www.deddie.gr ) consists of 7 standard sections to be completed by the interested person. The interested person must already have chosen the type of equipment which will be installed and have carried out the relevant technical study.
HEDNO examines the application and sends, within twenty (20) days from receipt of the application, a Grid-connection Offer to the interested person, including a description of necessary works as well as related costs. This grid-connection offer is valid for three (3) months from its date of issue.
 
Authorisation request
Authorisation request
Step Difficulty:  Low
 
Authority NameHEDNO
SpecialistsEngineer